|
2006 Youth Work Camps Obion, Tennessee
Built two wheelchair
ramps (separate homes)
- Improved a wheelchair at still another home
- Repaired stairway
- Installed door hardware
- Fixed plumbing
- Fixed electrical
- Installed three storm doors (separate homes)
- Painted floor
- Installed ceiling tile (indoor room)
- Installed outdoor porch ceiling
- Patched hole in bedroom floor
- Installed a bedroom door
- Installed playground equipment at host site's day care
- Sorted winter clothes at local Thrift store
|